Services Provided: Design Support, Traffic Study and Construction Supervision:
- Widening of Southbound and Northbound SKBSH (Packages 1 and 2- Stage2A, 2A’, 2B, 2B’ & 1C).
- Left Turn Flyover Bridge (Stage 4).
- Design and Supervision of Retrofit parapet and bearing works at theexisting bridges (Khalifa A, B, and Budaiya bridges).
- H2W2 barriers installation works along the ramps of existing bridgesand SKBSHW.
- Open channel works at Stage 1C and 3B.
- Landscaping works along SKBSH highway and Al Hajar area.
- Stormwater networks for Package 1 and 2.
- Street Lighting Networks for package 1 and 2.